Projects per year
Projects
- 4 Active
Search results
-
Active
Evaluation and integration of the monitoring results in the Scheldt-estuary
Van Ryckegem, G. (Project leader), Breine, J. (Cooperator), De Wever, A. (Cooperator), Maesele, R. (Cooperator), Mertens, W. (Cooperator), Mertens, A. (Cooperator), Piesschaert, F. (Cooperator), Speybroeck, J. (Cooperator), Van Braeckel, A. (Cooperator), Van Spaendonk, G. (Cooperator), Van de Meutter, F. (Cooperator), Van den Bergh, E. (Cooperator), Vandenbroucke, P. (Cooperator), Vandevoorde, B. (Cooperator), Vanoverbeke, J. (Cooperator) & Wils, C. (Cooperator)
1/01/19 → 31/12/27
Project: Outline agreement
-
EU Eel Regulation
Desender, M. (Project leader), Belpaire, C. (Cooperator), Breine, J. (Cooperator), Coeck, J. (Cooperator), De Bruyn, A. (Cooperator), Froidmont, M. (Cooperator), Galle, L. (Cooperator), Lambeens, I. (Cooperator), Maes, Y. (Cooperator), Stevens, M. (Cooperator), Teunen, L. (Cooperator), Van Thuyne, G. (Cooperator), Van Wichelen, J. (Cooperator), Vandenbroucke, P. (Cooperator), Verhelst, P. (Cooperator) & Verschelde, P. (Cooperator)
1/01/15 → 31/12/25
Project: Legally bound
-
Ecotoxicological risk assessment, land use exploration and design of flood plains Sigma plan (De Vlaamse Waterweg nv)
Lettens, S. (Project leader), De Bodt, Y. (Cooperator), De Vos, B. (Cooperator), Louette, G. (Cooperator), Meiresonne, L. (Cooperator), Pieters, M. (Cooperator), Van Ryckegem, G. (Cooperator), Vandenbroucke, P. (Cooperator), Vervaet, K. (Cooperator) & Willems, K. (Cooperator)
1/01/11 → 31/12/25
Project: Outline agreement
-
Ecotoxicological risk assessment of soil contamination in dredging soils (De Vlaamse Waterweg nv)
Lettens, S. (Project leader), Aelterman, B. (Cooperator), De Boeck, T. (Cooperator), De Vos, B. (Cooperator), Neyrinck, S. (Cooperator), Pieters, M. (Cooperator), Van Breusegem, A. (Cooperator), Vandenbroucke, P. (Cooperator), Vervaet, K. (Cooperator) & Willems, K. (Cooperator)
1/01/11 → 31/12/25
Project: Outline agreement