Projects per year
Search results
-
Finished
Niche Beernem (EVINBO)
Adriaens, D., De Becker, P., De Dobbelaer, T. & Herr, C.
2/07/20 → 1/05/21
Project: Evinbo
-
Nutrient flows in the source region of the Zwarte Beek (EVINBO)
De Becker, P., De Dobbelaer, T., Herr, C. & Leyssen, A.
1/07/20 → 31/03/23
Project: Evinbo
-
LIFE Green Valleys
Packet, J., De Dobbelaer, T., De Becker, P., Adriaens, D., Wouters, J., Scheers, K., Smeekens, V., Wackenier, M., Herr, C. & Denys, L.
17/03/20 → 31/12/22
Project: Evinbo
-
Eco-hydrological study: Bolisserbeek and Dommel in preparation of the realisation of the conservation objectives (EVINBO)
De Dobbelaer, T., De Becker, P., Wackenier, M. & Van der Auwermeulen, B.
1/03/19 → 1/03/21
Project: Evinbo
-
Evaluation and optimisation of the current assessment framework for the effects of floods on vegetation
De Dobbelaer, T., De Saeger, S., De Becker, P. & Wils, C.
1/01/19 → 1/12/19
Project: Demand
-
Ecohydrology of the Abeek Valley (Limburg) (EVINBO)
De Dobbelaer, T., De Becker, P., Herr, C. & Wouters, J.
1/05/18 → 2/11/22
Project: Evinbo
-
NICHE-calculations in the Demer valley (EVINBO)
Adriaens, D., De Becker, P., De Dobbelaer, T., Herr, C., Louette, G. & Van Ballaert, S.
19/10/16 → 31/12/22
Project: Evinbo
-
Ecohydrological study LIFE + Helvex Kalmthouse Heide section Stappersven (EVINBO)
Milbau, A., Herr, C., De Becker, P., De Dobbelaer, T., Van der Auwermeulen, B. & Van Ballaert, S.
1/09/15 → 31/01/18
Project: Evinbo
-
Dubergbroek: investigation into the topography and hydrography in the framework of nature restoration (LIFE+ Hageland) (EVINBO)
Milbau, A., Herr, C., De Becker, P., De Dobbelaer, T., Van der Auwermeulen, B. & Van Ballaert, S.
1/09/15 → 31/12/17
Project: Evinbo