Projects per year
Search results
-
Finished
EMFloodResilience: Mapping the impact of the summer flood 2021 along the river Meuse to optimise future river management and policy
Van Braeckel, A. (Project leader), Bezdenjesnji, O. (Cooperator), Galle, L. (Cooperator), Jocqué, M. (Cooperator), Lambeens, I. (Cooperator), Smeekens, V. (Cooperator), Terrie, T. (Cooperator), Van Ryckegem, G. (Cooperator), Van den Bergh, E. (Cooperator) & Verreycken, H. (Cooperator)
31/08/22 → 31/12/23
Project: Evinbo
-
Fish injury, mortality and passage at te pumping station Groot Schijn
Buysse, D. (Project leader), Coeck, J. (Cooperator), De Maerteleire, N. (Cooperator), Gelaude, E. (Cooperator), Pauwels, I. (Cooperator), Pieters, S. (Cooperator), Plaetinck, S. (Cooperator), Rosseel, D. (Cooperator), Smeekens, V. (Cooperator), Vanden Houten, J. (Cooperator) & Verhelst, P. (Cooperator)
31/08/21 → 30/06/23
Project: Evinbo
-
LIFE Green Valleys
De Becker, P. (Project leader), Adriaens, D. (Cooperator), De Dobbelaer, T. (Cooperator), Denys, L. (Cooperator), Herr, C. (Cooperator), Packet, J. (Cooperator), Scheers, K. (Cooperator), Smeekens, V. (Cooperator), Wackenier, M. (Cooperator) & Wouters, J. (Cooperator)
17/03/20 → 31/12/22
Project: Evinbo
-
Climate resilient nature management (EVINBO)
Raman, M. (Project leader), Cools, N. (Cooperator), De Becker, P. (Cooperator), De Blust, G. (Cooperator), De Smet, L. (Cooperator), De Vos, B. (Cooperator), Denys, L. (Cooperator), Roskams, P. (Cooperator), Smeekens, V. (Cooperator), Thoonen, M. (Cooperator), Van Calster, H. (Cooperator), Van der Aa, B. (Cooperator) & Wouters, J. (Cooperator)
31/12/19 → 30/12/21
Project: Evinbo
-
Platform appropriate assessment - partim local conservation status (LSVI) surface waters
Denys, L. (Project leader), Leyssen, A. (Cooperator), Packet, J. (Cooperator), Scheers, K. (Cooperator) & Smeekens, V. (Cooperator)
1/01/16 → 30/06/19
Project: Legally bound
-
Platform Appropriate Assessment, partim abiotics surface water
Denys, L. (Project leader), Kumpen, M. (Cooperator), Leyssen, A. (Cooperator), Packet, J. (Cooperator), Scheers, K. (Cooperator), Smeekens, V. (Cooperator) & Usta, Ö. (Cooperator)
26/10/15 → 30/06/19
Project: Legally bound
-
Follow-up of the expansion and renovation of the Zwin (EVINBO)
Provoost, S. (Project leader), Buerms, D. (Cooperator), De Beukelaer, J. (Cooperator), De Regge, N. (Cooperator), Elsen, R. (Cooperator), Geunens, O. (Cooperator), Lefranc, C. (Cooperator), Mertens, A. (Cooperator), Smeekens, V. (Cooperator), Soors, J. (Cooperator), Speybroeck, J. (Cooperator), Van Braeckel, A. (Cooperator), Van Gompel, W. (Cooperator), Van Ryckegem, G. (Cooperator), Van den Bergh, E. (Cooperator) & Vanoverbeke, J. (Cooperator)
31/12/10 → 30/03/24
Project: Evinbo