Ecohydrological study for the PAS custom area 'Turnhouts Vennengebied' (EVINBO)

Project Details

Abstract

At the request of the intendant of the PAS custom area Turnhouts Vennengebied, INBO will carry out an ecohydrological study in order to support the hydrological and soil restoration, and the nature target allocation. Currently, phase 1 of the study has been initiated.
The aim of phase 1 is to synthesize existing data and information, to better define knowledge gaps, and to provide some preliminary proposals of measures.
StatusActive
Effective start/end date1/07/2231/12/25

Thematic List 2020

  • Water
  • Soil & air