Evaluation of controlled reduced tides under the Framework Agreement with De Vlaamse Waterweg nv

Project Details

Abstract

Under the Sigma plan, flood plains will be set up along the Scheldt. The project monitoring of the Sigma areas is intended to evaluate the effects of the design measures in relation to the nature objectives set. The measurement campaign includes fishing on the main watercourses and stagnant waters of the project areas in spring and autumn. After sampling of the baseline situation and site design, followup is foreseen at 1,3 and 6 years after establishment and every 6 years thereafter.
StatusActive
Effective start/end date1/01/1331/12/24

Thematic List 2020

  • Protected nature
  • Water

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.