Skip to main navigation Skip to search Skip to main content

Monitoring the effect of mitigating measures in the Kempense Kleiputten in Beerse (EVINBO)

Project Details

Abstract

In 2015, we made a monitoring plan to follow up the effect of mitigating measures against acidifying deposition, in the framework of an environmental permit for a company close to the habitat directive area Kempense Kleiputten. In 2017-2018, the first monitoring round for this project was carried out (T0).
Now, the company asks if we can also carry out the second monitoring round, and more specifically the follow-up of the acidification sensitive aquatic habitats within the zone of the presumed deposition plume. These aquatic habitats should be monitored every three years. We determine the physico-chemical status, carry out a vegetation survey, determine the conservation status of the ponds, and analyse the epiphytic diatoms.
StatusFinished
Effective start/end date1/05/2131/05/22

Thematic List 2020

  • Climate
  • Data & infrastructure
  • Soil & air

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.