Niche Brasschaat (EVINBO)

Project Details

Abstract

In support of the MER-procedure (environmental impact report) for the re-licensing of the groundwater extraction of Pidpa in Brasschaat, the ecohydrological model NICHE Flanders is used to estimate the impact of various hydrological scenarios on the potential for groundwater-dependent vegetation.
StatusFinished
Effective start/end date18/12/1730/06/20

Thematic List 2020

  • Protected nature
  • Water
  • Soil & air

Thematic list

  • Monitoring networks
  • Environment